DRDO carries out salvo launch of Pralay missiles

2. Why in the News

3. Background & Evolution

4. Core Static Facts

Parameter Detail
Type Solid-propellant, quasi-ballistic, surface-to-surface, short-range tactical missile [S2]
Range ~150 km – 500 km [S2]
Payload 350–700 kg / 500–1,000 kg — HEPF, Penetration-Cum-Blast (PCB), Runway Denial Penetration Submunition (RDPS) [S2]
Terminal speed Mach 5–6 [S2]
Guidance Advanced inertial navigation; CEP < 10 m; MaRV (Manoeuvrable Re-entry Vehicle) technology [S2]
Launch platform Road-mobile canister launcher (Ashok Leyland 12×12), shoot-and-scoot capable [S2]
Developing lab Research Centre Imarat (RCI), Hyderabad, with DRDL, ASL, ARDE [S1]
Production partners BDL, BEL [S1]
Test range Integrated Test Range (ITR), Chandipur, off Odisha coast [S1]
Parent Ministry Ministry of Defence (DRDO) [S1]
Salvo launch date 31 December 2025 (test); reported in press 1 January 2026

5. Multi-Dimensional Analysis

Strategic / Geopolitical - Fills a tactical-strike gap for targeting radar sites, command posts, and advance airfields, useful in a short, high-intensity border conflict scenario [S2]. - Enhances credible conventional deterrence without crossing the nuclear threshold, given it is a conventional-warhead system [S1][S2].

Scientific / Technological - Demonstrates indigenous capability in quasi-ballistic missile design, MaRV technology, and multi-launcher salvo firing — a complex feat requiring precise sequencing and telemetry tracking [S1][S2]. - Salvo capability (multiple missiles, same launcher, quick succession) signals progress toward saturation-strike readiness [S1].

Administrative - Testing conducted through coordinated efforts of DRDO labs (RCI, DRDL, ASL, ARDE) and ITR Chandipur, illustrating DRDO's decentralized lab-based R&D model [S1]. - Transition from developmental trials to user evaluation trials indicates movement toward Army induction [S1].

Economic - Involvement of DPSUs BDL and BEL as production partners supports domestic defence-manufacturing/"Atmanirbhar Bharat" ecosystem and import substitution [S1].

6. Recent Developments (last 12–18 months)

7. Prelims Hooks

8. Mains Relevance

9. Related Topics to Study Next

10. Common Errors / Trap Areas

11. Sources