PROGRESS ON SMART METER INSTALLATION UNDER RDSS

I have enough Tier-1 facts. Writing the note now.

PROGRESS ON SMART METER INSTALLATION UNDER RDSS

1. At a Glance

2. Why in the News

3. Background & Evolution

4. Core Static Facts

5. Multi-Dimensional Analysis

Economic - Aims to fix structural losses of DISCOMs; AT&C losses dropped from ~22.3% (FY21) to ~16.4% (FY22) [S6]. - Prepaid model improves DISCOM cash-flow and reduces working-capital borrowings [S2].

Technological - AMI rollout enables two-way communication, remote disconnect/reconnect, outage detection, time-of-day tariffs and integration with renewables/EV [S5]. - Daily installation rate ~80,000 meters scaling toward 1 lakh/day [S5].

Administrative / Federal - Power is a Concurrent List subject; DISCOMs are State entities — scheme conditions funding on State reform action plans evaluated by MoP [S2]. - Front-runners: Bihar (~63 lakh) and Assam (~32 lakh) smart meters installed (as on Mar 2025) [S5].

Social / Consumer - Eliminates manual meter reading, faulty billing, estimated bills; enables consumer-side monitoring via apps [S5]. - Concerns: prepaid model can disconnect poor consumers if balance lapses (equity issue, not in primary source).

6. Recent Developments (last 12-18 months)

7. Prelims Hooks

8. Mains Relevance

9. Related Topics to Study Next

10. Common Errors / Trap Areas

11. Sources