Kalai-II Hydro Electric Project (1200 MW) — UPSC Study Note

1. At a Glance

2. Why in the News

3. Background & Evolution

4. Core Static Facts

5. Multi-Dimensional Analysis

Economic - Adds 4,852.95 MU/yr of dispatchable peaking power to support peak demand management and national grid balancing [S1]. - ₹14,105.83 cr capex into a remote frontier district; State gets equity via ₹750 cr CFA — fiscal federalism through the enabling-infrastructure scheme [S1][S4].

Strategic / Geopolitical - Lohit basin lies close to the McMahon Line / LAC with China; first hydro on Lohit asserts upstream user rights on a Brahmaputra tributary as China plans large dams on the Yarlung Tsangpo. - Strengthens State power supply in a frontier border district (Anjaw borders Tibet/Myanmar) [S1].

Environmental - Large hydro is classified as Renewable Energy since the 2019 Cabinet reform — contributes to non-fossil 500 GW by 2030 and Panchamrit climate commitments [S4]. - Lohit/Eastern Himalaya is in a seismic Zone V, biodiversity-rich, with downstream concerns in Assam (cumulative impact, Dibang/Lohit/Siang) — risks of forest diversion and tribal displacement.

Administrative / Federal - Model = Centre-State JV via Central PSU (THDC) replacing private MoU model that had stalled 12 projects [S2]. - Uses the modified Budgetary Support for Enabling Infrastructure scheme (roads, bridges, transmission), revised by Cabinet to deepen support for remote NE projects [S4].

6. Recent Developments (last 12–18 months)

7. Prelims Hooks

8. Mains Relevance

9. Related Topics to Study Next

10. Common Errors / Trap Areas

11. Sources