PM to visit Uttarakhand and UP on 14 April

1. At a Glance

2. Why in the News

3. Background & Evolution

4. Core Static Facts

Parameter Detail
Length 213 km, six-lane access-controlled [S2]
Cost ~₹11,963 crore [S2]
Implementing agency NHAI under MoRTH; programme: Bharatmala Pariyojana (EPC) [S2]
States traversed Delhi → Uttar Pradesh (Saharanpur, Shamli, Baghpat) → Uttarakhand [S2]
Wildlife elevated corridor 12 km — longest in Asia, through Rajaji National Park eco-sensitive zone [S1][S4]
Other wildlife features 8 animal passes, 2 elephant underpasses (200 m each), ~340–370 m Daat Kali tunnel [S1][S4]
Travel time >6 hrs → ~2.5 hrs [S1][S2]
Study partner Wildlife Institute of India (WII), Dehradun (autonomous body under MoEFCC) [S4]

5. Multi-Dimensional Analysis

Economic - Improves NCR–Doon Valley freight & tourist logistics; spurs Saharanpur/Shamli land-use shift [S2]. - Reduces fuel use & vehicle-operating cost via 3.5-hour saving per trip [S1].

Environmental - Passes Shivalik landscape & Rajaji NP; mitigations engineered to prevent habitat fragmentation of elephant/tiger/leopard corridors [S1][S4]. - WII study confirmed underpass utilisation by wildlife — empirical proof of road-ecology mitigation working [S4].

Scientific / Technological - Elevated viaduct design + tunnelling under temple zone; structured monitoring with camera-trap + occupancy modelling by WII [S4].

Administrative / Governance - Inter-state coordination (Delhi-UP-UK); convergence of MoRTH, MoEFCC, WII, NHAI, state forest depts — model for green highways under MoRTH's policy [S4].

Strategic / Connectivity - Strengthens access to Char Dham circuit feeder routes; complements Char Dham All-Weather Road and Rishikesh–Karnaprayag rail [S2].

6. Recent Developments (12–18 months)

7. Prelims Hooks

8. Mains Relevance

9. Related Topics to Study Next

10. Common Errors / Trap Areas

11. Sources